Alexandria is set to unveil big plans along the waterfront and King Street in Old Town.
On Wednesday (Oct. 7), the city will seek approval from the Board of Architectural Review on major aesthetic and structural changes that would see red bricks replacing asphalt along the unit and 100 blocks of King Street, a 20-foot-wide walkway with a riverside railing running from Robinson Terminal South to the base of King Street, new promenades at Waterfront Park and Point Lumley Park and more.
“The project includes the construction of a new marine bulkhead, replacement of aging and undersized stormwater infrastructure with a larger-capacity drainage system, and improvements to Waterfront Lumley Park and the 100 block of King Street,” the city said in its request for alterations.
In June, City Council approved a new plan to build an “enhanced gravity storm sewer system” to combat flooding along the waterfront in Old Town. At the time, only 30% of the plan was designed, as the city needed to pivot after the National Park Service earlier this year denied the city’s plan to build a controversial pump station at Waterfront Park (1 Prince Street).
“As part of the stormwater improvements, existing out-of-date pipes will be replaced with a new drainage system that incorporates valve vaults and outfalls in lieu of the previously proposed pump station from the Certificate of Completeness,” the city said. “These upgrades are designed to improve stormwater management and reduce flood risks along the waterfront while minimizing above-grade infrastructure impacts.”
The city’s previously approved proposal would have closed Waterfront Park and Point Lumley Park from the fall of 2026 until the fall of 2028 to rebuild segments of the sea wall and to install the pump station to recirculate water in flood-prone areas back to the Potomac River.

Alexandria’s waterfront saw 227 flooding events at the Prince Street level from January to October 2025, compared to a 20-year average of 145 events, according to city data. Annual flood-related costs, including cleanup, sandbagging and lost business revenue, range from $400,000 to $800,000. Without city intervention, the city predicted there would be 353 annual flooding events at the Prince Street level by the year 2100.
The BAR meets 7 p.m. Wednesday at Charles Houston Recreation Center (901 Wythe Street).