News

Notes: Get ready for some road work, Alexandria

Good Monday morning, Alexandria!

⛈️ Today’s weather: A slight chance of showers after 2 p.m. Increasing clouds, with a high near 80 degrees. Calm wind becoming south 5 to 9 mph in the morning. The chance of precipitation is 20%. Showers tonight, mainly after midnight. Low around 65 degrees. Southeast wind 5 to 8 mph. The chance of precipitation is 80%. New precipitation amounts between a tenth and a quarter of an inch are possible.

🚨 You need to know

Get ready for some road work, Alexandria! The city’s Department of Transportation and Environmental Services has just released its street repaving and maintenance schedule for the week of May 12-16.

Here’s what’s on the agenda:

– Several streets are getting a fresh coat of asphalt, including Boyle Street, Newton Street, West Windsor Avenue, Fern Street, East Marsteller Street, and Oronoco Street. If you live or work in these areas, keep an eye out for project signs and letters with more details.

– Don’t forget about those “No Parking” signs! They’ll be popping up before work starts, so make sure to move your car to avoid tickets or towing.

– The city’s also tackling some concrete work. Expect to see improvements to ADA ramps, curbs, and gutters at the intersection of South Van Dorn Street and Eisenhower Avenue, as well as on North Armistead Street.

– New aprons are coming to several spots, including the 300 block of Lamond Place, 900 block of Juniper Place, 0 block of East Howell Avenue, and 2500 block of Ridge Road.

Citywide Street Repaving

  • Boyle Street (from Buchanan Street to end)
  • Newton Street (from East Braddock Road to East Luray Avenue)
  • West Windsor Avenue (from Russell Road to West Braddock Road)
  • Fern Street (from North Quaker Lane to Osage Street)
  • East Marsteller Street (from East Walnut Street to East Oak Street)
  • Oronoco Street (from Earl Street to end)

Citywide Concrete Maintenance

ADA Ramp Enhancements/Curb and Gutter

  • Intersection of South Van Dorn Street and Eisenhower Avenue
  • North Armistead Street (entire length)

Apron Installations

  • 300 block of Lamond Place
  • 900 block of Juniper Place
  • 0 block of East Howell Avenue
  • 2500 block of Ridge Road

Just a heads up: This schedule isn’t set in stone. Weather, equipment issues, or conflicts with other city projects might shake things up a bit.

Looking ahead, concrete work on Duke Street from Roth Avenue to Wheeler Avenue is set to kick off on May 19. This is laying the groundwork for future repaving, so expect some lane closures and delays.

Got questions or concerns? Check out alexandriava.gov/go/2356 or use the Alex311 service to get in touch.

📈 Sunday’s most read

The following are the most-read ALXnow articles for May 11, 2025.

  1. Notes: Today marks 276 years since 60 acres were designated for a new settlement called Alexandria
  2. Alexandria City Council to vote on gas-powered leaf blower ban next week
  3. Agenda Alexandria to examine local election history and future during May program

📅 Upcoming events

Here is what’s going on today in Alexandria.

Organizing an event? Submit your event to ALXnow’s Event Calendar.

Things To Do

Live Music & Entertainment

City of Alexandria

About the Author

  • This is the staff byline for ALXnow, used by editors and other full-time staff. Launched in October 2019, ALXnow is the place for the latest news, views and things to do around Alexandria, Virginia.