
A new report on the city’s Floodplain Management Plan offers a look at what’s ahead for flood mitigation projects around the city.
Two items in the report highlight progress on flood mitigation along the waterfront. Two parts of the mitigation plan are re-grading sections of lower King Street and nearby streets to improve drainage and minimize flooding and the construction of an elevated walkway along the waterfront.
“The city is currently in procurement of a Progressive Design-Build contract and is scheduled to have a contract in place in the first quarter of Fiscal Year 2024,” the report said. “The city intends to make improvements to the waterfront area and protect to elevation 6.0’ (NAVD88) between Duke Street and Queen Street including lower King Street, Union Street and The Strand.”
The report says the 10-year budget for the project is $48.2 million, with a total of $108.6 million appropriated for the project.
For the elevated walkway, the report says the current schedule is to have a contract in place in the first quarter of Fiscal Year 2024.
The report also said excavation of sediment from the channel bed of Cameron Run is scheduled for Fiscal Year 2024.
The report said four additional projects are currently under contract and in the design stage:
- Mount Vernon Avenue cul de sac storm sewer improvements ($1.4 million) — flood mitigation for townhomes on Mount Vernon Avenue, including alley grading, drainage improvements and more. Construction is scheduled to start in February 2024 and be completed by November.
- Hume Avenue storm sewer bypass project ($2.5 million) — flood mitigation for homes on Hume Avenue. A storm pipe will be installed to bypass the existing storm pipe. Construction is scheduled to start in June 2024 and be completed by March 2025.
- Hooffs Run Timber Branch Bypass project ($60 million) — construction of a new storm sewer pipe system to transport stormwater from Timber Branch away from Hooff’s Run Culvert. Construction is scheduled to start in September 2026 and be completed by June 2028.
- E. Glebe, Commonwealth, Ashby storm sewer capacity project ($50 million) — a conveyance capacity, storage, and green infrastructure upgrade for the often-flooded intersection. Construction is scheduled to start in April 2026 and be completed by January 2028.
Recent Stories

If you had a chance to enhance a child’s future with a time commitment of less than 2 hours a week, how would you respond? You have that opportunity right now to join over 200 Alexandrians as a reading tutor volunteer with the Alexandria Tutoring Consortium (ATC).
ATC tutors work with one child in kindergarten, first, or second grade in Alexandria public schools who need extra help with reading. Tutors meet with their Book Buddy 1-2 times each week for 30 minutes October-May at school, during school hours. Many struggling readers only receive one-on-one instruction through this program, and it makes all the difference. Last year, ATC served 195 children, of whom 82% ended the year reading on grade level and 96% made substantial reading gains. But the need is great, and we are still seeing learning lags from the pandemic.
This year, ATC plans to significantly increase the size of the program to reach over 250 students and to serve every elementary school in Alexandria. This is very exciting news, but we will only succeed if we can recruit more tutors. ATC trains you, matches you with a child, and provides ongoing lesson materials and support.

If you have been thinking about buying your first home or haven’t owned one in the last three years, THIS IS FOR YOU!
In the DMV area, it can be difficult to save the downpayment necessary for you to get into your own home. We have a solution. The Funder’s Summit!
We have assembled a summit with different municipalities to tell you how to access their funds for your home purchase.
Family Fun Fall Fest
Mark your calendars and join us for the Family Fun Fall Fest on Saturday, October 7, 2023, from 11am – 2pm!
This FREE in-person event will be held at the Shoppes at Foxchase, located at 4641 Duke St, Alexandria, VA
2023 Alexandria Fall Festival
Food trucks, bounce houses, pony rides, magic shows and more at the 2023 Alexandria Fall Festival, an Alexandria Living event presented by The Patterson Group. Join us at River Farm on Sunday, Nov. 5 from 11 a.m. – 4 p.m.