News

A new public dashboard will help residents stay informed on different aspects of water quality in the Potomac River.

The Reservoir Center for Water Solutions launched the dashboard in June alongside Anacostia RiverkeeperAnacostia Watershed Society and Potomac Riverkeeper Network.


News

Alexandria leaders cut the ribbon today (Wednesday) on RiverRenew, the city’s largest infrastructure project in history.

The project replaces Old Town’s 19th-century combined sewer system with a 12-foot-wide, two-mile-long waterfront tunnel system and sewer infrastructure to divert approximately 120 million gallons of raw sewage from flowing into the Potomac River every year.


News

RiverRenew, the largest infrastructure project in Alexandria’s history, is coming online on Wednesday, July 1.

John Hill, chair of AlexRenew‘s board of directors, said that replacing Old Town’s 19th century combined sewer system with a tunnel system and sewer infrastructure has been a “gargantuan” task. The wastewater project will divert approximately 120 million gallons of raw sewage from flowing into the Potomac River every year.


News

Proposed changes to the base charge for Alexandria’s wastewater customers will be addressed at a public hearing Saturday (May 16).

AlexRenew, which operates the city’s wastewater service, is proposing updates to how its base charge is calculated. The utility proposes calculating the base charge using the monthly water use of a typical household, rather than the current method based on a customer’s meter size. For residential customers, water use of 3,500 gallons would equal one unit. For commercial customers, average usage volume would be converted into units relative to residential customers’ usage to set the base charge.


News

AlexRenew will cut the ribbon on the new promenade at RiverRenew Plaza on Oct. 18 at Pendleton and N. Union Streets in Old Town.

The new plaza at 501 N. Union Street sits atop AlexRenew’s RiverRenew project, which will divert millions of gallons of raw sewage from the Potomac River via a 2.2-mile-long underground tunnel that’s been under construction for four years. Speakers at the ribbon-cutting ceremony include Mayor Alyia Gaskins, AlexRenew Board Chair John Hill, AlexRenew CEO Justin Carl, and Waterfront Commission Chair Louise Roseman.


News

This week, AlexRenew is inspecting the Potomac Interceptor Sewer within Jones Point Park along the waterfront in Old Town.

AlexRenew will conduct video inspections and run bypass pumps along the Potomac Interceptor Sewer in the park, the wastewater treatment authority announced on social media.


News

Good morning, Alexandria! 👋 Today is Wednesday, Aug. 13, the 225th day of 2025. There are 140 days left in the year.

⛈️ Today’s weather: A chance of showers and thunderstorms, mainly after 2 p.m. Partly sunny, with a high near 91. Calm wind becoming south around 6 mph in the afternoon. The chance of precipitation is 40%.